Upcoming Project Information: Chardon Road Resurfacing

March 27, 2024

Public questions and comments are welcome for this upcoming road resurfacing project.

Upcoming Project Information: Chardon Road Resurfacing

 

The Ohio Department of Transportation and the City of Euclid are currently planning a project that will involve the asphalt resurfacing of Chardon Road (US 20) from East 221st Street to the East Corporation Line in Euclid, Cuyahoga County, Ohio. Additionally, the project will include upgrades to ADA curb ramps, pavement repairs, partial curb replacement, pavement markings, and signage. Construction is currently scheduled to begin in the summer of 2025.

 

We welcome your questions and comments. Issues you may wish to comment on may include, but are not limited to, the effect of the project on local residents, air quality, the local economy, floodplains, and historic or cultural resources. Comments are requested by May 1, 2024, to ensure your comments may be considered during project development.

 

Questions or comments? Please contact:

Daniel Knecht,

Public Service Director,

City of Euclid at:


Phone: 216.289.2701

Email: dknecht@cityofeuclid.com

August 18, 2026
Items can be dropped off Sept. 14th through 18th- 8am to 3pm at John A. Piscitello Service Center: 25200 Lakeland Blvd.
August 13, 2026
Building Resilient Shorelines: Join Us for a Nature-Based Strategies Workshop Living along Lake Erie offers stunning views and vibrant community life, but lakefront property owners and coastal communities also face distinct challenges from shoreline erosion and storm damage to habitat loss. To address these challenges, the City of Euclid is excited to host an interactive community workshop: Building Resilient Strategies: A Workshop for Lake Erie Property Owners and Communities . Supported by a grant from the National Fish & Wildlife Foundation’s National Coastal Resilience Fund (NCRF) , this event is designed to help local residents explore sustainable, eco-friendly approaches to shoreline protection. What Are Nature-Based Strategies (NbS)? Nature-based strategies (NbS) use natural materials and ecological design to help stabilize coastlines. Unlike traditional hard infrastructure, NbS measures offer dynamic benefits, including: Erosion Control & Shoreline Stabilization: Protecting property against wave action and weather. Storm Damage Protection: Absorbing impact during severe weather events. Water Quality Improvement: Filtering runoff naturally before it reaches Lake Erie. Habitat Creation: Supporting local wildlife and aquatic ecosystems. Whether you are looking to protect your own shoreline or interested in coastal management for the broader community, this workshop will guide you through taking ideas from initial concept to full implementation. Interactive Design Session for Property Owners Are you a lakefront property owner? Bring photographs or drawings of YOUR shoreline! During the workshop, attendees will have the opportunity to participate in an interactive design process to discuss tailored solutions and potential approaches for their specific property. Event Details Date: Thursday, September 10, 2026 Time: 6:00 PM – 7:30 PM Location: Lakefront Community Center (1 Bliss Ln, Euclid, OH 44123) RSVP: To RSVP for this event CLICK HERE ! How to Learn More For questions or additional information about the workshop, please reach out to: Contact: Christine McIntosh, Planning Manager Email: CMcIntosh@cityofeuclid.gov Phone: 216-289-8154 This event is presented by the City of Euclid in partnership with NFWF, SmithGroup, Cleveland Urban Design Collaborative (CUDC), US Army Corps of Engineers, Cuyahoga Soil & Water Conservation District, Great Lakes and St. Lawrence Cities Initiative, LimnoTech, The Ohio State University, and County Planning.
August 5, 2026
Release of Public Service Application for Fiscal Year (FY) 2027 CDBG Support
August 4, 2026
Gain the Power to Save a Life: Euclid Fire Department Heartsaver CPR & AED Course
More Posts